Storm Shelter Delivery

Storm shelter delivery and Setup Process

Delivering Safety and Peace of Mind

Whether you’re facing a super tornado or a hurricane, Pro Storm Shelters has your employees covered with our above-ground storm shelters! Pro Storm Shelters are easy to install, no digging, pouring concrete or cranes needed for installation. The installation and anchoring of our storm shelters do not require a concrete pad, saving you hundreds of dollars!

Our storm shelters can sit directly on almost any level surface such as dirt, gravel, concrete, or asphalt. And our custom-built delivery trucks can set your shelter within three feet of existing structures without the need for cranes. Because they’re above-ground shelters, you won’t have to dig a huge hole in your yard. Usually, shelters can be delivered, anchored, and ready for use within two hours!

FAcilitate your Shelter's Delivery Process

  • Wide turns and open space are necessary.
  • Surface must be able to support 45,000 pounds (or 22 1/2 tons).
  • Cannot navigate through ditches, standing water, or loose ground like sand or pea gravel.
  • Can’t drive over anything taller than 4 inches, We need an installation site that is at least 16 feet wide and has a clearance height of at least 13 feet.
  • The ground under the legs must be firm and able to support the six to 12 tons of weight.
  • the truck will need to pull straight forward at least 30 to 35 feet before turning or going up or down an incline.
  • The shelter cannot be turned or moved – accuracy during placement is critical.
  • The driver will anchor all four corners of the shelter.
  • Installation process will take about two hours if all goes smoothly.

ReQUEST A QUOTE

Contact us today for any questions over our above ground storm shelters to see if our shelters make sense for your business!